Rehabilitation and up-gradation of Giddalur- Vinukonda section of NH- 544D in the State of Andhra Pradesh to two Lane with Paved Shoulder under NH (O) on Hybrid Annuity Mode.

Project Description

The Project road connects Giddalur - Vinukonda section of NH-544D. It starts from Km 212.983 and ends at Km 322.800 of NH-544D, having total project length of 112.797 Km and passes through districts of Prakasam and Guntur. This project is a part of road connecting major cities and ports of east coast which is connecting new capital city of Andhra Pradesh Amaravati with Anantapuram in Rayalaseema. The Project Road connects Giddalur, Bestavaripeta, Cumbum, Kunta, and Tripuranthakam of Prakasam districts with Vinukonda of Guntur district.

Project Location map

Project Overview

The Authority (National Highways Authority of India) has entrusted the “Rehabilitation and up gradation of Giddalur – Vinukonda section of NH-544D from Design km 212.983 (existing km 322.840) to Design Km 322.800 (Existing Km 322.840) (Design length 112.797 km) in the state of Andhra Pradesh to two lane with paved shoulders under NH (O) on Hybrid Annuity Mode.

Project Name Rehabilitation and up-gradation of Giddalur- Vinukonda section of NH-544D from Design Chainage Km 212.983 (Existing Km 213.00) to Design Km 322.800 (Existing Km 322.840) (Design Length 112.797km) in the State of Andhra Pradesh to two Lane with Paved Shoulder under NH (O) on Hybrid Annuity Mode.
NH No. NH-544D
Scheme / Phase NHDP – Phase IV
Mode of the Execution Hybrid Annuity Mode
No. of Lanes/Configuration 2 Lane with paved shoulders
Length of the Project (in Km) 112.797 Km
Bid Project Cost INR 678.69 Cr
Client National Highways Authority of India
Concessionaire M/s. GV Road Projects Pvt. Ltd, Hyderabad
Independent Engineer M/s MSV International Inc. in association with Samarth Infra Engg. Technocrats Pvt Ltd.,
EPC Contractor M/s BVSR Constructions Pvt. Ltd., Hyderabad
DPR Consultant M/s STUP Consultants Pvt Ltd.,
Design Consultant M/s HBS infra engineers India Pvt. Ltd., Hyderabad
Date of Award – LOA 26.03.2018
Agreement Date 07.05.2018
Appointed date 06.02.2019
Concession Period 17 Years (including Construction period)
Construction Period 730 days (2 Years) from the Appointed Date: 06.02.2019
O&M Period (in Years) 15 Years
Scheduled Date of Completion 04.02.2021
Commencement of IE Services 23.03.2019

Salient Features of Project

Description Project Data
Length of the Project 112.797 Km
Service Road (SR) 11.87 Km
Slip Road (SLR) 8.724 Km
Bypasses 02 Nos (4.98 Km)
Flyover (FO) 03 Nos
Vehicular Under Pass (VUP) 01 No
Road over Bridges (ROB) 1 No New Construction +1 No Retained
No. of Major Bridges (MJB) 03 Nos
No. of Minor Bridges (MIB) 34 Nos
No. of Box/Slab Culverts (BC/SC) 147 Nos
No. of Hume Pipe Culverts (PC) 68 Nos
Rest Areas 02 Nos
Truck lay – byes 02Nos
Toll Plazas 02 Nos
Major Junctions 10 Nos
Minor Junctions 31 Nos
Bus Bays /shelters 44 Nos